Fast chargers on the route Panevėžys → Utena
From Panevėžys to Utena. The number on the left is the distance in km from the start. DC chargers only; all chargers, AC included. Data updated .
-
0km
-
0km
-
0kmElektrum Drive · Panevėžys · 1.7 km off the road60 kW DC CHAdeMO CCS 5/6 available
-
0km
-
0kmEldrive · Panevėžys · 787 m off the road45 kW DC Type 2 CCS 3/4 available
-
0kmStuart Energy · Panevėžys · 1.3 km off the road160 kW DC CCS 1/1 available
-
0km
-
0kmStuart Energy · Panevėžys · 1.3 km off the road250 kW DC CCS 6/6 available
-
1km
-
1kmEldrive · Panevėžys · 483 m off the road200 kW DC Type 2 CCS 4/4 available
-
1km
-
1km
-
1km
-
1km
-
1kmStuart Energy · Panevėžys · 465 m off the road150 kW DC CCS 1/1 available
-
2km
-
2km
-
2km
-
2kmEnefit, UAB · Panevėžys · 773 m off the road47 kW DC CCS 3/4 available
-
2kmEnefit, UAB · Panevėžys · 603 m off the road47 kW DC CCS 4/4 available
-
3km
-
3kmStuart Energy · Panevėžys · 477 m off the road60 kW DC CHAdeMO Type 2 CCS 2/3 available
-
3km
-
9kmIONITY · Aplinkkelis · 1.8 km off the road350 kW DC CCS 3/4 available
-
9kmIgnitis ON · Šilagalio km. · 991 m off the road150 kW DC CHAdeMO Type 2 CCS 4/5 available
-
9kmno price given📍 Directions
-
58kmInbalance grid · Kurėnai · 108 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
63kmEnefit, UAB · Ukmergės · 1.4 km off the road240 kW DC CCS 2/4 available
-
63kmStuart Energy · Ukmergė · 1.5 km off the road120 kW DC Type 2 CCS 0/3 availableno price given📍 Directions
-
82km
-
121kmEnefit, UAB · Utena · 1.5 km off the road47 kW DC CCS 4/4 available
-
121kmEldrive · Utena · 1.5 km off the road400 kW DC CCS 4/4 available
-
121kmInbalance grid · Utena · 45 m off the road125 kW DC CCS 1/1 available
-
122kmEldrive · Utena · 716 m off the road50 kW DC CHAdeMO Type 2 CCS 3/5 available
-
122kmEldrive · Utena · 1.5 km off the road50 kW DC Type 2 CCS 2/4 available
-
122km
-
122kmEldrive · Utena · 16 m off the road200 kW DC CCS 2/2 available
-
122km
-
122kmEldrive · Utena · 690 m off the road50 kW DC CHAdeMO Type 2 CCS 3/5 available
-
122kmInbalance grid · Utena · 1.5 km off the road125 kW DC CCS 1/2 available
-
122km
-
123kmEldrive · Utena · 402 m off the road200 kW DC CCS 2/2 available
Charging an EV on the drive from Panevėžys to Utena
The drive from Panevėžys to Utena is about 122.8 km and takes roughly 97 min by car. Ultra-fast (≥150 kW) chargers on the way: 27, so a single 20–30 minute stop is usually enough, even in winter.
On a long drive the fastest charger matters more than the cheapest: a DC charger of 150 kW or more takes a battery from 20% to 80% in roughly 20–30 minutes, while an 11 kW AC charger would need several hours. That is why the cheapest and the fastest charger on the route are shown separately above — they are usually different places.
Prices are per kWh including VAT and are “from” prices: a station can have several prices, and the operator may also charge for charging time, parking or the session. Check the price in the operator’s app before you charge.
Need a route between other places? The charging route planner takes any address in Lithuania or your current location.