Fast chargers on the route Palanga → Kaunas
From Palanga to Kaunas. The number on the left is the distance in km from the start. DC chargers only; all chargers, AC included. Data updated .
There are 75 fast chargers on the route — the first 60 from the start are shown.
-
0km
-
0kmEnefit, UAB · Palanga · 1.1 km off the road100 kW DC Type 2 CCS 9/10 available
-
0km
-
1kmLidl · Palanga · 407 m off the road50 kW DC CHAdeMO Type 2 CCS 3/3 available
-
1km
-
1km
-
1kmElektrum Drive · Palanga · 95 m off the road60 kW DC CHAdeMO Type 2 CCS 15/16 available
-
1kmEldrive · Palanga · 245 m off the road150 kW DC CCS 2/2 available
-
1kmEnefit, UAB · Palanga · 93 m off the road200 kW DC CCS 4/4 available
-
3kmEV Infrastruktūra, UAB · VILIMIŠKĖS K · 76 m off the road464 kW DC CCS 2/2 available
-
3kmEV Infrastruktūra, UAB · Vilmiškių K. · 76 m off the road464 kW DC CCS 0/2 available
-
20km
-
20km
-
21km
-
22kmIgnitis ON · Trušeliai, Klaipėdos r. · 1.2 km off the road150 kW DC CCS 4/4 available
-
23kmElektrum Drive · Ginduliai · 1.0 km off the road50 kW DC CHAdeMO CCS 8/8 available
-
23km
-
27kmStuart Energy · Klaipėda · 1.1 km off the road250 kW DC CCS 4/4 available
-
27km
-
27kmIgnitis ON · Klaipėda · 1.9 km off the road150 kW DC CCS 0/8 available
-
28kmInbalance grid · Jakų k. · 116 m off the road435 kW DC CCS 2/3 available
-
28km
-
29kmIgnitis ON · Jakų k., Klaipėdos r. · 97 m off the road150 kW DC CHAdeMO CCS 5/5 available
-
33kmElektrum Drive · Gobergiškės · 37 m off the road150 kW DC CHAdeMO CCS 4/4 available
-
39kmInbalance grid · Gargždai · 94 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
39kmEldrive · Gargždai · 1.6 km off the road200 kW DC CHAdeMO Type 2 CCS 5/5 available
-
72kmEldrive · Žadvainai · 57 m off the road400 kW DC CHAdeMO CCS 22/22 available
-
93kmInbalance grid · Šilalės r. · 37 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
93kmInbalance grid · Šilalės r. · 32 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
121km
-
128kmEV Infrastruktūra, UAB · Raseinių r. · 46 m off the road270 kW DC CCS 2/2 available
-
128kmEV Infrastruktūra, UAB · Raseinių r. · 46 m off the road522 kW DC CCS 2/3 available
-
128kmEV Infrastruktūra, UAB · Raseinių r. · 46 m off the road522 kW DC CCS 2/3 available
-
128kmElektrum Drive · Pikeliai · 61 m off the road300 kW DC CHAdeMO CCS 6/6 available
-
129kmEV Infrastruktūra, UAB · Raseinių r. · 75 m off the road464 kW DC CCS 2/2 available
-
129kmEV Infrastruktūra, UAB · Raseinių r. · 75 m off the road464 kW DC CCS 0/2 available
-
138km
-
139kmInbalance grid · Raseinių r. · 57 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
144km
-
146kmInbalance grid · Raseinių r. · 60 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
158km
-
175kmEldrive · Verėduva · 81 m off the road400 kW DC CHAdeMO CCS 19/21 available
-
184kmEnefit, UAB · Ariogala · 1.3 km off the road47 kW DC Type 2 CCS 4/4 available
-
189kmInbalance grid · Raseinių r. · 63 m off the road72 kW DC CHAdeMO Type 2 CCS 0/3 available
-
190kmInbalance grid · Raseinių r. · 26 m off the road72 kW DC CHAdeMO Type 2 CCS 3/3 available
-
209kmInbalance grid · Vareikonių k., Kauno r. · 82 m off the road435 kW DC CCS 3/3 available
-
213kmEnefit, UAB · Babtai, Kauno raj. · 798 m off the road47 kW DC Type 2 CCS 3/4 available
-
223kmEldrive · Žemaitkiemis · 958 m off the road200 kW DC Type 2 CCS 4/4 available
-
227kmInbalance grid · Žemaitkiemio k., Kauno r. · 399 m off the road350 kW DC CCS 2/2 available
-
229km
-
229km
-
230km
-
230kmEldrive · Kaunas · 1.2 km off the road24 kW DC CCS 1/1 available
-
230km
-
230km
-
231kmEldrive · Kaunas · 30 m off the road400 kW DC CCS 4/4 available
-
231km
-
231km
-
232km
-
232kmEnefit, UAB · Kaunas · 1.6 km off the road47 kW DC CCS 4/4 available
Charging an EV on the drive from Palanga to Kaunas
The drive from Palanga to Kaunas is about 236.2 km and takes roughly 152 min by car. Ultra-fast (≥150 kW) chargers on the way: 43, so a single 20–30 minute stop is usually enough, even in winter.
On a long drive the fastest charger matters more than the cheapest: a DC charger of 150 kW or more takes a battery from 20% to 80% in roughly 20–30 minutes, while an 11 kW AC charger would need several hours. That is why the cheapest and the fastest charger on the route are shown separately above — they are usually different places.
Prices are per kWh including VAT and are “from” prices: a station can have several prices, and the operator may also charge for charging time, parking or the session. Check the price in the operator’s app before you charge.
Need a route between other places? The charging route planner takes any address in Lithuania or your current location.